2008W Chalet Challenge

The aim of this design project was to develop a prototype alpine chalet. The objective was to design a chalet that could be serially produced, yet still be innovative. It had to be possible for the end user to build the chalet independently and with only small tools (hammer, screwdriver, etc.).

2008W Steel Student Trophy

The task was to design a football stadium on a fixed plot of land in the south of Vienna. The capacity of the planned stadium was for 35,000 spectators. All the planning documents for the property and a rough space allocation plan were provided by the client.

The design of the supporting structure should give a significant role to the material steel and the principle of lightweight construction. Attention was to be paid to a sustainable concept, not only with regard to the resource- and environmentally friendly use of materials, but also with regard to the efficient use of the structure.