Electrical works Gußhaus 3rd and 4th floor

Construction work will be carried out from 17 to 18 April 25

Façade and window refurbishment Hof 3 Karlsplatz from April 2025

Expected construction period: end of April to December 2025

According to the latest information from GUT, the scaffolding will be erected in April 2025 and the façade renovation is scheduled to start in May 2025. The window replacement is planned for the 2025 summer vacation.

Design of the outdoor area Getreidemarkt

Design of the outdoor area between BF and BC from 1.5.25 to presumably 30.3.26

Informatikhörsaal renovation summer vacation 2025

The lecture hall equipment will be renovated during the summer months of 2025.

Construction work Freihaus summer vacations 2025

renovation of Mensa
refurbishing of physics library


Glass porch Stiege 7 Karlsplatz summer vacation 2025

Between mid-July and mid-September 2025, the glass porch will be renovated.
Access from courtyard 2 to staircase 7 will be closed during this period.

Façade renovation, window replacement Karlsplatz AE Karlsgasse/Paniglgasse wing 2026

Scheduled March to December 2026

Together with the companies carrying out the work and in consultation with the central teaching and learning room management, GUT is endeavoring to keep the noise impact on teaching caused by the construction sites as low as possible. Should your course nevertheless be affected by construction site noise, please contact the central teaching support team. Hoteline DW 40040 or email: zslti@tuwien.ac.at