Management & Leadership Programs at TU Wien Academy for Continuing Education

Welcome to the TU Wien Academy for Continuing Education, where we provide a comprehensive range of lifelong learning opportunities for professionals, academics and executives. Our mission is to empower our students with top-tier education and training, enabling them to excel in their chosen fields.

## Our Programs

Executive MBA

Executive MBA

Designed for experienced professionals seeking to advance their careers and develop leadership skills.

Master's Programs

Master's Programs

Comprehensive degree programs for students looking to specialize in a specific field and gain in-depth knowledge.

University Courses

University Courses

A range of individual certificate programs for students and professionals to enhance their skills and knowledge in various disciplines.

Compact Programs

Compact Programs

Short-term, focused programs for busy professionals seeking to quickly acquire new skills and stay competitive.

Construction site tour “The Village - Aspanggründe Vienna”

On 10 April, Philipp Lapornik from IMMOABS organized a guided tour of the Apanggründe area, during which Gregor Wiltschko from ARE Projektmanagement and Cornelia Dorothé Bredt from ARE Quartiersmanagement explained the major project as part of a tour.

Participants of the tour

1 of 8 images or videos

Participants of the tour

1 of 8 images or videos

[Translate to English:]

[Translate to English:]

Info poster

1 of 8 images or videos

Participants of the tour

1 of 8 images or videos

Participants of the tour

1 of 8 images or videos

Participants of the tour

1 of 8 images or videos

Model showing the area

1 of 8 images or videos

View on the area from above

1 of 8 images or videos

For a long time, the site was a “blind spot” in the urban fabric. As early as the early 19th century, the TU Vienna flirted with the idea of building the Faculty of Mechanical Engineering here. Some cornerstones of projects that were never realized were even buried. What remained were some laboratory facilities, which have since been relocated to the Arsenal.

In 2000, the architect Norman Foster developed a master plan for the Aspanggründe, which was never implemented. After more than a year of planning, the urban master plan by Superblock Architekten was finally realized step by step. In 2020, the necessary rezoning was approved by the Vienna City Council - allowing building heights of up to ten storeys.

Subsequently, 22 building plots with a gross floor area of around 250,000 m² were designated, of which around three quarters are intended for residential use. The site is characterized by a remarkable terracing and all building plots are in direct contact with the open space. It is currently without doubt the largest construction project within the Gürtel.

The majority of the building plots are being realized by ARE itself. The efforts in the area of energy supply are also remarkable: An output of around 400 kW is to be provided via approximately 500 geothermal probes at a depth of around 150 meters. Great importance is also attached to the choice of materials during project implementation.

Events

14. April 2025, 10:54 until

Construction site tour “The Village - Aspanggründe Vienna”

Other

On 10 April, Philipp Lapornik from IMMOABS organized a guided tour of the Apanggründe area, during which Gregor Wiltschko from ARE Projektmanagement and Cornelia Dorothé Bredt from ARE Quartiersmanagement explained the major project as part of a tour.

For a long time, the site was a “blind spot” in the urban fabric. As early as the early 19th century, the TU Vienna flirted with the idea of building the Faculty of Mechanical Engineering here. Some cornerstones of projects that were never realized were even buried. What remained were some laboratory facilities, which have since been relocated to the Arsenal.

In 2000, the architect Norman Foster developed a master plan for the Aspanggründe, which was never implemented. After more than a year of planning, the urban master plan by Superblock Architekten was finally realized step by step. In 2020, the necessary rezoning was approved by the Vienna City Council - allowing building heights of up to ten storeys.

Subsequently, 22 building plots with a gross floor area of around 250,000 m² were designated, of which around three quarters are intended for residential use. The site is characterized by a remarkable terracing and all building plots are in direct contact with the open space. It is currently without doubt the largest construction project within the Gürtel.

The majority of the building plots are being realized by ARE itself. The efforts in the area of energy supply are also remarkable: An output of around 400 kW is to be provided via approximately 500 geothermal probes at a depth of around 150 meters. Great importance is also attached to the choice of materials during project implementation.

Calendar entry

Public

No

 

Entrance fee

No

 

Registration required

No